Toyota Land Cruiser 100 / Amazon, Lexus LX 470

Since 1997 of release

Repair and car operation



Tojota Lend Kruzer, Amazon, Leksus LX470
+ Identification numbers of the car
+ Controls and receptions of safe operation of the car
+ Options and car routine maintenance
- The engine
   + Typical procedures of service of engines
   + Procedures of service of the petrol engine
   - Procedures of service of the diesel engine
      Removal, installation, dismantling and assemblage of a head of cylinders
      Removal and installation of the inlet pipeline and final collector
      Removal, check of a condition and installation of a belt of drive ГРМ
      Removal and installation of cogwheels of drive ГРМ
      Replacement of a forward epiploon of a cranked shaft and epiploons of a camshaft and ТНВД
      Replacement of a back epiploon of a cranked shaft
      Removal and installation of camshafts and pushers of valves
      Removal and pallet installation картера the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation маслоохладителя
      Removal and installation приводного a disk
+ Systems of cooling of the engine, salon and air conditioning heating
+ The power supply system and release of the fulfilled gases
+ Engine electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ Gear change box
+ Transmissionnaja line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment





Removal, check of a condition and installation of a belt of drive ГРМ

Removal

Exact observance of phases газораспределения is very important, but for engines DOHC important extremely. Incorrect installation of phases can seriously damage the engine. Be accurate at installation of a belt of drive ГРМ and before the first start after repair once again check up coincidence of labels.


Do not turn cranked or camshafts at removed belt ГРМ, and also do not turn the engine for cogwheels of camshafts. Turn the engine only in its normal direction (clockwise).

Assemblage of drive ГРМ


 PERFORMANCE ORDER

1. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

2. Turn out spark plugs.
3. Remove all components, covers of belt ГРМ stirring to removal.
4. Uncover (1) belts ГРМ (address to an illustration above).
5. Turn a cranked shaft clockwise and level adjusting labels (2).
6. Make sure that labels (4) too have coincided.
7. Give and completely turn out bolts of fastening of assemblage натяжителя belt ГРМ.
8. Remove assemblage натяжителя (6), turn out a bolt (7) pulleys натяжителя and remove a pulley (8).
9. Remove a belt of drive ГРМ.

Check

The description of check for the engine 2UZ-FE (Has undressed Removal, check of a condition and installation газораспределительного a belt and cogwheels of drive ГРМ) see.

Installation

 PERFORMANCE ORDER

1. Fix a rod натяжителя a belt of drive ГРМ, крошев a hairpin in the thickness of 1.5 mm in apertures in a rod and most натяжителе.
2. Put on belt ГРМ pulleys and make sure that adjusting labels coincide.
3. Establish a pulley натяжителя and tighten bolts of its fastening with effort of 34 Nanometers.
4. Establish натяжитель and tighten bolts of its fastening with effort of 13 Nanometers.
5. Take out a lock hairpin, thereby having pulled a belt.
6. Turn a cranked shaft on two turns clockwise. Make sure that adjusting labels coincide. Otherwise repeat procedure of installation and a tension of belt ГРМ.
7. Establish other acting in film components upside-down. Tighten fixture with demanded effort.
8. Dump indications К/Л of replacement of a belt of drive ГРМ. For this purpose address on HUNDRED Toyota.
9. After replacement of a belt of drive ГРМ check up work of the fuel pump of a high pressure.