Toyota Land Cruiser 100 / Amazon, Lexus LX 470

Since 1997 of release

Repair and car operation



Tojota Lend Kruzer, Amazon, Leksus LX470
+ Identification numbers of the car
+ Controls and receptions of safe operation of the car
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, salon and air conditioning heating
- The power supply system and release of the fulfilled gases
   Specifications
   Sbrasyvanie pressure in the power supply system
   Check of serviceability of functioning of the fuel pump, measurement of pressure of fuel
   Check of a condition and replacement of fuel lines and them штуцерных connections
   Removal and installation of a fuel tank
   Cleaning and repair of a fuel tank - the general data
   Removal and installation of the fuel pump
   Replacement of the gauge of the expense of fuel
   Removal and installation of assemblage of an air cleaner
   Removal, installation and adjustment of a cable of an accelerator
   System of electronic injection of fuel (EFI) - the general information
   Check of serviceability of functioning of system of electronic injection
   Check of a condition and replacement of components of system of injection
   Release system - the general information
   Removal and installation of atomizers
+ Engine electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ Gear change box
+ Transmissionnaja line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment





Check of a condition and replacement of components of system of injection

Before to start performance of procedures wait full cooling of the engine! The prevention in pressure Razdela Sbrasyvanie beginning in the power supply system see also.


If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for audiosystem input in action!

The throttle case

Check

 PERFORMANCE ORDER

1. Check up smoothness of a course throttle заслонки.
2. Start the engine, disconnect all vacuum hoses and, by means of the vacuum gauge measure depth of depression in each of ports of the case of a throttle idling and at frequency of rotation of the engine of 3500 rpm. Compare results of measurements to requirements of standard cards.

Replacement

Details of installation of the case of a throttle on engines 2UZ-FE


The device of the case of a throttle on engines 2UZ-FE is a little original. The privodnoj cable carries out only preliminary function. Management throttle заслонкой the electronic. On the throttle case the gauge of position throttle заслонки (TPS) which informs ECU on its current position is established. Pressure on conclusions VTA and VTA2 ECU changes from 0 to 5 In proportional to a corner of opening throttle заслонки. Thus ECU, comparing the received signal to signals from other gauges, gives a command to the electromotor with magnetic coupling of a drive throttle заслонки to modify its position (if it is necessary) according to requirements of a foot of the driver ». If any of elements of electronic control throttle заслонкой fails, its drive is carried out only by means of a pedal and a cable, and closing – осредством a returnable spring. The system demands at the reference with it accuracy. Do not suppose blows and at all do not drop system. Accuracy also is required and at the reference with electric connections.

 PERFORMANCE ORDER

1. Remove an acoustic/decorative cover of the engine (address to an illustration above).
2. Merge cooling liquid.
3. Remove the top part of the inlet pipeline.
4. Disconnect from the case of a throttle an accelerator cable.
5. Disconnect an electric socket from TPS.
6. Disconnect an electric socket of the electromotor of management throttle заслонкой.
7. Disconnect a socket of the gauge of position of a pedal of an accelerator.
8. Disconnect conducting of the gauge from two collars on a conducting arm
9. Disconnect a ventilation hose картера and water перепускной a hose from the throttle case.
10. Remove a ventilating cap. Give two bolts and two nuts and remove the case of a throttle from the inlet pipeline. Disconnect water перепускной a hose from the thermostat on the case of a throttle and remove the case of a throttle from the engine. Remove a lining.
11. Installation is made upside-down. Establish a new lining of the case of a throttle. Track, that fixing bolts and nuts have been tightened with demanded effort. Fill in cooling liquid. Get the engine and be convinced of absence of leakings.

Regulator of pressure of fuel

Replacement

Design of a regulator of pressure of fuel

1 — the Sealing ring
2 — the Valve
3 — the Vacuum hose of management

4 — the Spring
5 — the Diaphragm

The scheme of installation of a regulator of pressure of fuel


 PERFORMANCE ORDER

1. Dump pressure in the power supply system (Razdel Sbrasyvanie of pressure in the power supply system see) and disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for equipment input in action!

2. The scheme of installation and a design of a regulator of pressure of fuel are presented on illustrations above. Disconnect from a pressure regulator a vacuum hose.
3. Get under a hose of return of fuel drain capacity, or wrap up its rags.
4. Compress a fixing collar and disconnect a hose of return of fuel from a pressure regulator.
5. On models V8 give a counternut and remove a regulator about a sealing ring.
6. Do not forget to replace a sealing ring and track correctness of landing of a regulator on a highway. The further installation is made as it should be the return to an order of dismantle of components.

Fuel highway and injectors

Check

The description of procedure of check of system of injection in Section Check of serviceability of functioning of system of electronic injection see.

Replacement

Components of system of injection of fuel


 PERFORMANCE ORDER

1. Dump pressure in the power supply system (Razdel Sbrasyvanie of pressure in the power supply system see) and disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped by a security code before to disconnect the battery make sure that have a correct combination for equipment input in action!

2. Uncover cases of a throttle and the top part of the inlet pipeline (the Engine see the Head).
3. Having prepared for fuel flood, remove демпфер fuel pulsations, the top lining and топливопроводы (address to an illustration above).
4. Remove a cable of an accelerator and give two nuts of fastening from an arm (see Has undressed Removal, installation and adjustment of a cable of an accelerator).
5. Remove a hose from valve PCV.
6. Disconnect an electric socket from the electrovacuum valve of system EVAP. Disconnect a collar of fastening of a cable of an accelerator and remove electrovacuum valve EVAP from an inlet collector.
7. From an arm of a cover of the case of a throttle disconnect diagnostic socket DLC1, then turn out a bolt and remove an arm.
8. Mark and disconnect collars of fastening of conducting of the engine from arms.
9. Give a bolt of fastening of a collar on a returnable fuel tube to the left part of a fuel highway. Turn out bolts from a forward (transitive) fuel tube.
10. Hang identification labels on contact sockets of each of injectors. Disconnect from injectors electroconducting and shift a plait aside.
11. Give four nuts of fastening of fuel highways to the bottom part of the inlet pipeline.
12. Remove fuel highways together with the injectors, four remote plugs and eight insulators. Be accurate. Injectors keep only at the expense of sealing rings, at removal of fuel highways do not drop injectors.
13. Establish on all injectors уплотнители, grease new sealing rings with gasoline and establish them on injectors.
14. Slightly rotating an injector to the left-to the right, insert it into a nest on a fuel highway (address to an accompanying illustration). Establish thus all injectors.
15. Establish fuel highways sockets of injectors upwards.
16. Establish new insulators and plugs on the places on the inlet pipeline. Acquire bolts of fastening of fuel highways to the inlet pipeline.
17. Be convinced of possibility of injectors to rotate. If the injector "has got stuck", check up position of a sealing ring or replace it.
18. Attach sockets of injectors according to the hung labels.
19. The further installation is made upside-down. Track, that all fixture has been tightened with demanded effort.
20. Start the engine and make sure of absence of leakings.