Toyota Land Cruiser 100 / Amazon, Lexus LX 470

Since 1997 of release

Repair and car operation



Tojota Lend Kruzer, Amazon, Leksus LX470
+ Identification numbers of the car
+ Controls and receptions of safe operation of the car
+ Options and car routine maintenance
- The engine
   + Typical procedures of service of engines
   - Procedures of service of the petrol engine
      Removal and installation of covers of heads of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of final collectors
      Removal, check of a condition and installation газораспределительного a belt and cogwheels of drive ГРМ
      Replacement of a forward epiploon (ов) a cranked shaft / of camshafts
      Replacement of a back epiploon of a cranked shaft
      Removal and installation of camshafts and pushers of valves
      Removal and installation of heads of cylinders
      Removal and pallet installation картера the engine
      Removal, check of a condition and installation of the oil pump
      Removal and installation приводного a disk
      Check of a condition and replacement of support of an engine mount
   + Procedures of service of the diesel engine
+ Systems of cooling of the engine, salon and air conditioning heating
+ The power supply system and release of the fulfilled gases
+ Engine electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ Gear change box
+ Transmissionnaja line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment





Replacement of a back epiploon of a cranked shaft

 PERFORMANCE ORDER

1. Remove a transmission (the gear change Box see the Head).
2. Remove приводной a disk.
3. Removal of an old epiploon can be made without preliminary dismantle of the holder by поддевания its screw-driver (address to an accompanying illustration), however, in order to avoid risk of damage of a pin of a cranked shaft, composers of the present Management recommend to operate according to the instructions stated more low.
4. Turn out bolts of fastening of the holder to the block and remove assemblage, smooth out interfaced surfaces from fragments of a material of a lining and old hermetic.

Stop up an open part of the pallet with rags in order to avoid hit in small dust.

5. Having laid the removed holder on a workbench on two wooden blocks, beat out an old epiploon выколоткой from the back party of a plate (address to an accompanying illustration).
6. Wipe a nest under landing of an epiploon by acetone. Lay the holder on a flat firm surface and begin to knock in a nest a new epiploon, in quality оправки having taken advantage wooden бруском or a piece of a pipe of suitable diameter. Company Toyota recommends to use for installation of an epiploon cylindrical оправкой (SST 092233-15030-70010) the suitable size (address to an accompanying illustration).
7. Grease epiploon sponges with pure impellent oil.
8. Accurately having pressed the holder, plant it on the regular place. Operate without hurrying up, watching that has not occurred заворачивания epiploon sponges at its putting on on a shaft pin (address to an accompanying illustration). Screw fixing bolts and in regular intervals tighten them with demanded effort.
9. The further installation is made in an order, the return to an order of dismantle of components.