Tojota Lend Kruzer, Amazon, Leksus LX470
+ Identification numbers of the car
+ Controls and receptions of safe operation of the car
+ Options and car routine maintenance
+ The engine
+ Systems of cooling of the engine, salon and air conditioning heating
+ The power supply system and release of the fulfilled gases
+ Engine electric equipment
+ Control systems of the engine and decrease in toxicity of the fulfilled gases
+ Gear change box
- Transmissionnaja line
Specifications
Kardannye shaft and hinges - the general information
Condition check трансмиссионной lines
Removal and installation карданного a shaft
Replacement карданных hinges
Privodnye shaft/semiaxes, - the general information and condition check
Removal and installation of semiaxes, bearings and epiploons of the back bridge
Replacement of an epiploon of a leading gear wheel of differential
Removal and installation of assemblage of the back bridge
Removal and installation of power shafts
Replacement of protective covers and service of SHRUS
Removal and installation of assemblage of forward differential
Removal and installation of naves from a disconnected drive
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
|
Replacement of an epiploon of a leading gear wheel of differential
|
Extraction of epiploons of leading gear wheels back and forward (models 4WD) differentials is made in an identical manner.
|
|
1. Ослабьте nuts of fastening of back wheels. Поддомкратьте a back of the car also establish it on props. Prop up forward wheels противооткатными boots. Remove wheels, it is necessary for more exact measurement of a pretightness of a leading gear wheel. 2. Disconnect карданный a shaft from differential (see Has undressed Removal and installation карданного a shaft), shift it aside and tie up a wire to frame elements.
|
3. With the help динамометрического a key measure a twisting moment rotations (pretightness) of a leading gear wheel (address to an accompanying illustration). Write down result of measurement. |
4. With the help чертилки or кернера mark position from each other axes of a gear wheel, a fixing nut and a connecting flange. 5. Count quantity of open coils of a carving from a face surface of a nut to a cut of an axis of a gear wheel, result write down.
|
6. Fix a flange from проворачивания by means of the special adaptation, or having passed in an aperture of fastening of a collar карданного the hinge the big screw-driver and having jammed it under the arm located behind, a rigidity edge картера, or tubular section of the bridge (address to an accompanying illustration) and release a nut of a leading gear wheel. |
7. Thaw a gear wheel nut.
|
8. Remove a connecting flange, in case of need take advantage of a stripper (address to an accompanying illustration).
|
Do not try to hook at all a flange the lever, or to bring down its hammer! |
|
|
9. Take from the landing nest an old epiploon (address to an accompanying illustration). |
|
10. Grease sponges of a new epiploon with high-temperature greasing and in regular intervals begin to knock it in the landing nest. Track perpendicularity of landing of an epiploon, in quality оправки it is possible to take advantage of a face head of the suitable size, or a piece of a pipe of the corresponding diameter (address to an accompanying illustration). |
11. Having achieved combination of the components of landing labels put in the course of dismantle, establish into place a connecting flange, – in case of need tighten a flange a nut, but at all застукивайте it into place a hammer. 12. With not stiffening hermetic grease шлицы in the flange centre. 13. Establish a washer (if it is provided) and cautiously tighten a nut so that the gear wheel axis acted over its face surface on the quantity of coils of a carving noticed earlier (see paragraph 5). 14. Measure a twisting moment of rotation of a gear wheel, then tighten a nut for indemnification of the changes connected with installation of a new epiploon a little more, the twisting moment should be a little (but no more than on 0.6 Nanometers) more than at an old epiploon. 15. Connect карданный a shaft, establish to the place of a wheel, lower the car on the earth and tighten wheel nuts with demanded effort (see the Head of Adjustment and car routine maintenance). |
|
|
|